Project Title:SPRINGFIELD/BRANSON AIRPORT TERMINAL
Estimated Value:$58,297,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build airport terminals in Missouri depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Missouri
County:Greene
City:Springfield
Address:5000 W Kearney St

Project Type

Building Category:Airport Terminals
Work Type:New

Project Description:

Transportation Terminal New Commercial Airport Terminal Area; Casework & Graphics/Signage Package; Package Is For Counters, Signage & Miscellaneous Interior Elements For The Replacement Terminal Area Project & Consists Of Ticket Counters For Over 24 Agents Positions, Gate Ticket Pull Counters For 20 Positions, Overhead & Bag Device Display Structures, Miscellaneous Office Counter Millwork & Signage For The Terminal

Project Owner

SPRINGFIELD BRANSON REGIONAL AIRPORT

Project Design & Engineering

Civil Engineer: REYNOLDS SMITH & HILLS INC
Architect: REYNOLDS SMITH & HILLS INC
Blue Printer: SPRINGFIELD BLUE PRINT

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Architectural Woodwork
  • Decorative Metal
  • Dimensional Letter Signage
  • Electronic Message Signage
  • Illuminated Panel Signage
  • Metal Fabrications
  • Non Illuminated Panel Signage
  • Painting and Coating
  • Rough Carpentry
  • Signage
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of Missouri construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$18,186,318,014
    Bid Phase:$226,516,085
    Post-Bid:$58,818,274,713
    Civil Projects (value)
    Pre-Bid Phase:$1,422,502,887
    Bid Phase:$161,811,503
    Post-Bid:$25,027,696,042