This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of arena projects in Illinois are also available.
| Project Title: | ROCKFORD METRO CENTRE BP 3 LOCKER RM/OFC |
|---|---|
| Start Date: | 2007-07-01 |
| Estimated Value: | $15,000,000 - a more accurate cost estimate is available from RSMeans Online |
Arena Dressing/Changing, Equipment Storage, Food Preparation, Food Storage, Office[s] Press Box, Restroom, Storage Other Structural Frame, Structural Steel Frame, Other Exterior Wall, Split Face CMU Exterior, Built Up Roof, Standing Seam Metal Roof Other Structural Frame/Exterior Walls = Precast Concrete Early Start: Remodeling For Club Suites (Mini Suites), VIP Suite & Press Box, Suites At Upper Bowl, Hockey Team Offices & Hockey Team Remodeling Three Level Club: 3 Level Addition For A Variety Of Price Point Seating & Amenities On The South Bowl; Including Demolition Of Some Structured Seating MetroCentre Closure: Specialty Construction During Time Facility Is Scheduled Closed Annually; Consists Of Ice Extension & Upgrade, Seating Revisions, Dock Addition, Restroom Relocations, Video Board Installation New Entry: 4 Level Addition At Southwest Side In Space Provided By Removing Current 2 Level Built Work; Consists Of Basement Storage And Commissary Area, New Entry With Atrium Like Lobby, Enlarged Concouse, Restrooms & Ammenities, Private Suites, Outside Deck Food Court: Remodeling & Upgraded Amenities For Existing Food Court & Restrooms Increased Concourse Space; Existing Lobby Will Provide Shelled Space For Future Tenant
The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.