| Project Title: | GADOT 2 BRIDGES CONSTRUCTION |
|---|
| Start Date: | 2004-03-01 |
|---|
| Estimated Value: | Not Available (develop your own cost estimate with RSMeans Online) |
|---|
The cost to build
bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on
RSMeansOnline.com.
Project Location
| State: | Georgia |
|---|
| County: | Oconee |
|---|
| Address: | SR 15 Over Rose Creek/Various |
|---|
Project Type
Project Description:
Bridge[s] & Culvert[s] LUMP LUMP TRAFFIC CONTROL-STP-1267(13)01 1,000.000 HR TRAINING HOURS 4.750 AC TEMPORARY GRASSING 140.000 TN MULCH 6.000 EA CONSTRUCTION EXIT 520.000 LF CONSTRUCT AND REMOVE TEMPORARY PIPE SLOPE DRAIN 90.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP A 5,550.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP C 6.000 EA MAINTENANCE OF CONSTRUCTION EXIT 2.000 EA WATER QUALITY MONITORING AND SAMPLING 180.000 LF TEMPORARY SILT FENCE,TYPE A 11,100.000 LF TEMPORARY SILT FENCE,TYPE C LUMP LUMP GRADING COMPLETE-STP-1267(13)01 94.000 TN STAB AGGR,TP II,INCL MATL 1,470.000 SY GR AGGR BASE CRS,12 INCH,INCL MATL 220.000 TN RECYCLE ASPH CONC LEVELING,INCL BITUM MATL&H LIME 969.000 TN RECYCLED ASPH CONC 9.5 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIME 1,649.000 TN RECYCLED ASPH CONC 25 M SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIME 999.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIME 809.000 GL BITUM TACK COAT 632.000 S REINF CONC APPROACH SLAB 1,904.000 LF ASPHALTIC CONCRETE CURB-4 INCH 8.000 EA CONC SPILLWAY,TP 1 1,300.000 LF PVMT REINF FABRIC STRIPS,TP 1,INCL BITUM BINDER 2.000 CY CLASS B CONCRETE 96.000 LF SIDE DRAIN PIPE,18 IN,H 1-10 4.000 EA SAFET END SECTION 18 IN,SIDE DRAIN,6:1 SLOPE 214.000 LF SLOPE DRAIN PIPE,18 IN 640.00 SY STN DUMPED RIP RAP,TP 1,24 IN 200.000 SY STN DUMPED RIP RAP,TP 3,12 IN 840.000 SY PLASTIC FILTER FABRIC 9.000 EA RIGHT OF WAY MARKERS 12.000 SF HIGHWA SIGNS,TP 1 MATL,REFL SHEETING,TP 1 18.000 SF HIGHWAY SIGNS,TP 1 MATL,REFL SHEETING TP 6 58.000 LF GALV STEEL POSTS,TP 7 4.000 EA GROUND-MOUNTED BREAKAWAY SIGN SUPPORT 18.000 EA DELINEATOR,TP 1 252.000 LF GUARDRAIL,TP T 3,529.000 LF GUARDRAIL,TP W 4.000 EA GUARDRAIL ANCHORAGE,TP 1 4.000 EA GUARDRAIL ANCHORAGE,T 12 50.000 EA RAISED PVMT MARKERS TP 1 9.500 AC PERMANENT GRASSING 19.000 TN AGRICULTURAL LIME 25.000 GL LIQUID LIME 11.000 TN FERTILIZER MIXED GRADE 475.00 LB FERTILIZER NITROGEN CONTENT 877.000 SY PERMANENT SOIL REINFORCING MAT 1,000.000 SY BITUMINOUS TREATED ROVING,WATERWAYS 14,390.000 SY EROSION CONTROL MATS,SLOPES 269.000 CY BRIDGE EXCAVATION,STREAM CROSSING 1,727.000 SY GROOVED CONCRETE(326.000)LUMP SUPERSTR CONCRETE,CL AA,BR NO-1,STP-1267(13)01(342.000)LUMP SUPERSTR CONCRETE,CL AA,BR NO-2,STP-1267(13)01 708.000 LF CONCRETE BARRIER 318.000 CY CLASS A CONCRETE 104.000 CY SEAL CONC 1,221.000 LF PSC BEAMS,AASHTO TYPE III,BR NO-1,STP-1267(13)01 40,689.000 LB BAR REINF STEEL(77,020.000)LUMP SUPERSTR REINF STEEL,BR NO-1,STP-1267(13)01(106,803.000)LUMP SUPERSTR REINF STEEL,BR NO-2,STP-1267(13)0 6.000 EA H-PILE POINTS,HP 12 X 53 660.000 LF PILING IN PLACE,STEEL H,HP 10 X 42 1,325.000 LF PILING IN PLACE,STEEL H,HP 12 X 53 1.000 EA LOAD TEST,STEEL H,HP 1 X 42 2.000 EA LOAD TEST,STEEL H,HP 12 X 53 114.000 LF PILOT HOLES 4.000 EA COFFERDAM LUMP LUMP REMOVAL OF EXISTING BR,BR NO-1 LUMP LUMP DETOUR BRIDGE,24 F X 175 FT,STA-23+00 24.000 LF PILE ENCASEMENT,12 IN PILE 4,140.000 SY STN DUMPED RIP RAP,TP 1,24 IN 4,140.000 SY PLASTIC FILTER FABRIC
Project Owner
GADOT