Bridge & Culvert Project Case Study in Georgia

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of bridge & culvert projects in Georgia are also available.

Project Overview

Project Title:GADOT CR 11 BRIDGE CULVERT CALL NO 063
Estimated Value:$341,029 - a more accurate cost estimate is available from RSMeans Online
The cost to build bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Georgia
County:Terrell
Address:CR 11 Bellflower Rd At Herod Creek

Project Type

Building Category:Bridges & Culverts
Work Type:New

Project Description:

Bridge[s] & Culvert[s] LUMP LUMP TRAFFIC CONTROL - 1.000 AC TEMPORARY GRASSING 34.000 TN MULCH 4.000 E CONSTRUCTION EXIT 50.000 LF CONSTRUCT AND REMOVE TEMPORARY PIPE SLOPE DRAIN 40.000 LF CONSTRUCT AND REMOVE BALED STRAW EROSION CHECK 875.000 LF MAINTENANCE OF TEMPORARY SILT FENCE, TP C 20.000 LF MAINTENANCE OF BALED STRAW EROSION CHEC 4.000 EA MAINTENANCE OF CONSTRUCTION EXIT 2.000 EA WATER QUALITY MONITORING AND SAMPLING 6.000 MO WATER QUALITY INSPECTIONS 1,750.000 LF TEMPORARY SILT FENCE, TYPE C 161.000 CY FOUND BKFILL MATL, TP II LUMP LUMP GRADING COMPLETE - BR-0000-00(454) 01 1,711.000 SY GR AGGR BASE CRS, 6 INCH, INCL MATL 5.000 TN AGGR SURF CRS 25.000 TN RECYCLED ASPH CONC LEVELING, INCL BITUM MATL & H LIME 145.000 TN RECYCLED ASPH CONC 9.5 MM SUPERPAVE, GP 1 OR 2, INCL BITUM MATL & H LIME 190.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE, GP 1 OR 2,INCL BITUM MATL & H LIME 220.000 GL BITUM TACK COAT 239.000 CY CLASS A CONCRETE 27,137.000 LB BAR REINF STEEL LUMP LUMP REMOVAL OF EXISTING BR, STA NO - 136+59 315.000 SY STN DUMPED RIP RAP, TP 1, 36 IN 315.000 SY PLASTIC FILTER FABRIC 10.000 EA RIGHT OF WAY MARKERS 628.000 LF GUARDRAIL, TP W 2.000 EA GUARDRAIL ANCHORAGE, TP 1 2.000 EA GUARDRAIL ANCHORAGE, TP 12 18.000 EA RAISED PVMT MARKERS TP 1 4.000 EA RAISE PVMT MARKERS TP 2 2.000 AC PERMANENT GRASSING 4.000 TN AGRICULTURAL LIME 5.000 GL LIQUID LIME 2.000 TN FERTILIZER MIXED GRADE 200.000 LB FERTILIZER NITROGEN CONTENT

Project Owner

GADOT