| Project Title: | GADOT SR 137 TWO BRIDGES CALL NO 008 |
|---|
| Estimated Value: | $4,131,170 (a more accurate cost estimate is available from RSMeans Online) |
|---|
The cost to build
bridges & culverts in Georgia depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on
RSMeansOnline.com.
Project Location
| State: | Georgia |
|---|
| County: | Marion |
|---|
| City: | Buena Vista |
|---|
| Address: | SR 137 |
|---|
Project Type
Project Description:
Bridge[s] & Culvert[s] 1.014 MILES OF CONSTRUCTION OF A TOTAL OF TWO BRIDGES AND APPROACHES ON SR 137 OVER GIN CREEK AND OVER SHOALS CREEK. LUMP LUMP TRAFFIC CONTROL-BRST-0649(3)01 2.000 EA TRAFFIC CONTROL,PORTABLE IMPACT ATTENUATOR 2,000.000 HR TRAINING HOURS 9.000 AC TEMPORARY GRASSING 240.000 TN MULCH 4.000 EA CONSTRUCTION EXIT 17.000 EA CONSTRUCT AND REMOVE SILT CONTROL GATE,TP 3 1,200.000 LF CONSTRUCT AND REMOV TEMPORARY PIPE SLOPE DRAIN 102.000 EA CONSTRUCT AND REMOVE TEMPORARY DITCH CHECKS 7,500.000 LF CONSTRUCT AND REMOVE BALED STRAW EROSION CHECK 375.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP A 1,900.000 LF MAINTENANCE OF TEMPORARY SILT FENCE,TP C 102.000 EA MAINTENANCE OF EROSION CONTROL CHECKDAMS/DITCH CHECK 3,750.000 LF MAINTENANCE OF BALED STRAW EROSION CHECK 17.000 EA MAINTENANCE OF SILT CONTROL GATE,TP 3 4.000 EA MAINTENANCE OF CONSTRUCTION EXIT 2.000 EA WATER QUALITY MONITORING AND SAMPLING 14.000 MO WATER QUALITY INSPECTIONS 750.000 LF TEMPORARY SILT FENCE,TYPE A 3,800.000 LF TEMPORARY SILT FENCE,TYPE C LUMP LUMP GRADING COMPLETE-BRST-0649(3)01 11,500.000 TN GR AGGR BASE CRS,INCL MATL 260.00 TN AGGR SURF CRS 300.000 TN RECYCLED ASPH CONC LEVELING,INCL BITUM MATL&H LIME 2,700.000 TN RECYCLED ASPH CONC 25 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIM 1,725.000 TN RECYCLED ASPH CONC 9.5 MM SUPERPAVE,BLEND 1,INCL BITUM MATL&H LIME 2,198.000 TN RECYCLED ASPH CONC 19 MM SUPERPAVE,GP 1 OR 2,INCL BITUM MATL&H LIM 1,896.000 GL BITUM TACK COAT 570.000 SY REINF CONC APPROACH SLAB,INCL SLOPED EDGE 2,054.000 LF ASPHALTIC CONCRETE CURB-5 INCH 715.000 SY PLAIN CONC DITCH PAVING,4 IN 8.000 EA CONC SPILLWAY,TP 1 800.000 LF HIGH STRENGTH PVMT REINF FABRIC,18 IN WIDTH 2.000 CY CLASS B CONCRETE LUMP LUMP SHORING 168.000 LF STORM DRAIN PIPE,18 IN,H 1-10 16.000 LF SIDE DRAIN PIPE,8 IN,H 1-10 640.000 LF SIDE DRAIN PIPE,18 IN,H 1-10 24.000 EA SAFETY END SECTION 18 IN,SIDE DRAIN,6:1 SLOPE 10.000 EA FLARED END SECTION 18 IN,SIDE DRAIN LUMP LUMP CONSTR,MAINT&REMOVE DETOUR DRAINAGE STR,NO-1 LUMP LUMP CONSTR,MAINT&REMOVE DETOUR DRAINAGE STR,NO-2 LUMP LUMP CONSTR,MAINT&REMOVE DETOUR DRAINAGE STR,NO-3 500.000 LF UNDDR PIPE INCL DRAINAGE AGGR,6 IN 125.000 LF SLOPE DRAIN PIPE,10 IN 105.000 LF SLOPE DRAI PIPE,15 IN 6.000 EA METAL DRAIN INLET-COMPLETE ASSEMBLY 26.000 CY FLOWABLE FILL 350.000 SY STN DUMPED RIP RAP,TP 3,12 IN 350.000 SY PLASTIC FILTER FABRIC 2,710.000 LF TEMPORARY BARRIER,METHOD NO. 1 38.000 EA RIGHT OF WAY MARKERS 36.000 SF HIGHWAY SIGNS,ALUM EXTRUDED PANELS,REFL SHEETING,TP 3 76.000 SF HIGHWAY SIGNS,ALUM EXTRUDED PANELS,REFL SHEETING,TP 9 202.000 LF GALV STEEL POSTS,TP 7 166.000 LF GUARDRAIL,TP T 2,163.000 LF GUARDRAIL,TP W 5.000 EA GUARDRAIL ANCHORAGE,TP 1 5.000 EA GUARDRAIL ANCHORAGE,TP 12 1,016.000 LF FIELD FENCE BARBED WIRE,3 STRANDS 2,375.000 LF FIELD FENCE SMOOTH WIRE,4 STRANDS 1,550.000 LF BARBED WIRE FENCE,6 STRAND 2.034 LM SOLID TRAFFIC STRIPE,5 IN,WHIT 1.420 LM SOLID TRAFFIC STRIPE,5 IN,YELLOW 3,640.000 GLF SKIP TRAFFIC STRIPE,5 IN,YELLOW 60.000 EA RAISED PVMT MARKERS TP 1 178.000 EA RAISED PVMT MARKERS TP 560.000 LF PREFORMED PLASTIC SOLID PVMT MKG,8 IN,CONTRAST(BLACK-WHITE),TP PB 560.000 GLF PREFORMED PLASTIC SKIP PVMT MKG,5 IN,YELLOW,TP PB 1.000 EA SPRING BOX 5,805.000 LF WATER MAIN,6 IN 3.000 EA GATE VALVE,6 IN
Project Owner
GADOT