Project Overview

Project Title:ARVAC FREEDOM HOUSE DORMITORY
Start Date:2002-10-01
Estimated Value:$350,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build special schools in Arkansas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Arkansas
County:Pope
City:Russellville
Address:Lake Front Dr

Project Type

Building Category:Special Schools, Military Dormitories, Clinics, Hospitals
Work Type:New

Project Description:

Hospital, Clinic, Special School Concrete Slab On Grade Foundation, Structural Steel Frame, Concrete Block Exterior, Rigid Insulation Roof Structure, Steel Joist Roof Structure, Steel Bar Joist Roof Deck , Asphalt Shingle Roof, Package Air Conditioning/Heat Pump System

Project Owner

ARVAC INC

Project Design & Engineering

Architect: CRAFTON, TULL & ASSOCS
Structural, Mechanical & Electrical Engineer: ICE ENGINEERS DIV OF CRAFTON & TULL

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Acoustical Ceilings
  • Acoustical Metal Pan Ceilings
  • Acoustical Panel Ceilings
  • Acoustical Tile Ceilings
  • Air Outlets and Inlets
  • Air to Air Energy Recovery Equipment
  • Architectural Wood Casework
  • Architecturally Exposed Structural Steel Framing
  • Carpeting
  • Carved Wood Doors
  • Cementitious Backing Boards
  • Cold Formed Metal Framing
  • Commissioning of HVAC
  • Communications Distribution
  • Compartments and Cubicles
  • Concrete Forming
  • Concrete Forming and Accessories
  • Concrete Reinforcing
  • Data Communications
  • Demolition
  • Diffusers Registers and Grilles
  • Distributed Communications and Monitoring Systems
  • Domestic Water Pumps
  • EIFS - Exterior Insulation and Finish Systems
  • Entrances and Storefronts
  • Fabricated Fireproofed Steel Columns
  • Facility Fire Suppression Water Service Piping
  • Finish Carpentry
  • Flush Wood Doors
  • Fountain Pumps
  • Glass Unit Masonry
  • Glazing
  • Gypsum Board
  • Gypsum Sheathing
  • Hardware
  • Heat Pipe Air to Air Energy Recovery Equipment
  • Heat Wheel Air to Air Energy Recovery Equipment
  • HVAC Gravity Ventilators
  • Interior Lighting
  • Low Voltage Electrical Transmission
  • Membrane Roofing
  • Metal Decking
  • Metal Doors and Frames
  • Metal Fabrications
  • Metal Joists
  • Painting and Coating
  • Planting
  • Plastic Laminate Clad Architectural Cabinets
  • Plumbing Fixtures
  • Prefinished Wood Doors
  • Resilient Base and Accessories
  • Resilient Flooring
  • Resilient Sheet Flooring
  • Resilient Tile Flooring
  • Sanitary Sewerage Pumps
  • Selective Site Demolition
  • Selective Structure Demolition
  • Sheet Carpeting
  • Sheet Metal Roofing
  • Stile and Rail Wood Doors
  • Structural Steel Framing
  • Sump Pumps
  • Suspension Systems
  • Swimming Pool Pumps
  • Testing Adjusting and Balancing for HVAC
  • Thermal Protection
  • Thermal Storage
  • Tile Carpeting
  • Tiling
  • Toilet Bath and Laundry Accessories
  • Transportation and Disposal of Hazardous Materials
  • Utilities
  • Voice Communications
  • Wood Doors
  • Wood Veneer Faced Architectural Cabinets
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of Arkansas construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$3,353,830,818
    Bid Phase:$50,800,868
    Post-Bid:$16,862,124,922
    Civil Projects (value)
    Pre-Bid Phase:$1,011,717,507
    Bid Phase:$66,588,000
    Post-Bid:$8,684,147,478