Convention Center Project Case Study in Missouri

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of convention center projects in Missouri are also available.

Project Overview

Project Title:JQH ARENA VERTICAL TRANSPORT BP CI 3.1
Estimated Value:$55,000,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build convention centers in Kansas depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Kansas
County:Greene
City:Springfield
Address:St Louis St At MSU

Project Type

Building Category:Convention Centers, Arenas
Work Type:New

Project Description:

Arena, Convention Center Concrete Foundation, Concrete Slab On Grade Foundation, Cast In Place Concrete Structural Frame, CMU Block Structural Frame, Other Structural Frame, Structural Steel Frame Other Structural Frame = Metal Wall Panels, Architectural & Structural Precast New 12,000 Seat Arena; Fabrication & Installation Of 3 Hydraulic Elevators - 2 Are Passenger Elevators, 3rd Is Service Elevator

Project Owner

CITY OF SPRINGFIELD-PLANNING & DEVT DEPT (Associate Owner)
JOHN Q HAMMONS HOTELS INC
MO STATE UNIVERSITY DESIGN & CONSTR

Project Design & Engineering

Architect: Ellerbe Becket
Associate Architect: PELLHAM PHILLIPS ARCHS & EGRS INC
Structural, Mechanical & Electrical Engineer: PELLHAM PHILLIPS ARCHS & EGRS INC
Structural Engineer: WELLS & SCALETTY

Project Construction

Construction Manager: JE DUNN CONST CO

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Concrete Forming
  • Concrete Forming and Accessories
  • Concrete Reinforcing
  • Elevators
  • Interior Lighting
  • Low Voltage Electrical Transmission
  • Metal Decking
  • Metal Fabrications
  • Structural Concrete
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of Missouri construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$18,186,318,014
    Bid Phase:$226,516,085
    Post-Bid:$58,818,274,713
    Civil Projects (value)
    Pre-Bid Phase:$1,422,502,887
    Bid Phase:$161,811,503
    Post-Bid:$25,027,696,042