Fencing Project Case Study in Minnesota

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of fencing projects in Minnesota are also available.

Project Overview

Project Title:MNDOT TH 61 MEDIAN BARRIER
Estimated Value:$297,853 - a more accurate cost estimate is available from RSMeans Online
The cost to build fencing in Minnesota depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Minnesota
County:Washington
City:Afton
Address:TH 10

Project Type

Building Category:Fencing
Work Type:New

Project Description:

Fencing CONCRETE MEDIAN BARRIER CONSTRUCTION Located in Washington County on T.H. 61 from 0.14 Miles North of Bridge 82022 to 0.23 Miles South of T.H. 10. The major items of work are:rem. c&g 3,859 lin. ft.,rem. conc. walk 7,740 sq. ft.,rem. drainage struct. 4 ea.,saw bit. pavt. 3,859 lin. ft.,com. exc. 450 cu. yd.,reinf.-epoxy 1,450 ea.,reconst. drainage struct. 4 ea.,conc. walk 4,635 sq. ft.,conc. c&g 281 lin. ft.,conc. med. barrier 2,162 lin. ft.,t-barrier 288 lin. ft.,raised pavt. marker 24 ea.,delineator 838 ea.,removable plastic marking 2,050 lin. ft.,pavt. marking-epoxy 5,000 lin. ft.

Project Owner

MN STATE DEPT OF TRANSPORTATION