Project Overview

Project Title:FRIENDSHIP FIRE STATION
Estimated Value:Not Available (develop your own cost estimate with RSMeans Online)
The cost to build fire stations in Oklahoma depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Oklahoma
County:Jackson
City:Altus
Address:16010 County Rd 210

Project Type

Building Category:Fire Stations
Work Type:New

Project Description:

Fire Station, Sidewalk[s], Curb[s], Gutter[s], Excavating & Grading Reinforced Concrete Foundation, Pre-fabricated Structural Frame, Metal Panel Exterior Pre-Engineered Metal Building, Barriers & Fencing, Concrete Walks, Concrete Formwork, Reinforced Concrete, Hollow Metal Doors & Frames, Heavyweight Concrete, Aluminum Windows, Upward Acting Doors, Soil Treatment, Utilities

Project Owner

ALTUS CENTRAL PURCHASING

Project Design & Engineering

Architect: GBA ARCHS

Project Construction

Concrete: ALLEN CONCRETE
Plumbing Contractor: KIP THORNTON
General Contractor: KUSTOM BUILDING