Flood Control Project Case Study in Nebraska

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of flood control projects in Nebraska are also available.

Project Overview

Project Title:CAMP ASHLAND FLOOD CONTROL
Estimated Value:$1,927,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build flood control in Nebraska depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Nebraska
County:Saunders
City:Ashland

Project Type

Building Category:Flood Control
Work Type:New

Project Description:

Flood Control Construction of a frontee levee at Camp Ashland. The levee will include embankment excavation, cohesive fill, cohesionless fill, topsoil, riprap, geotextile filter, levee surfacing, bedding, concrete L-wall, sheet piling; draining strucutre modification, clearing and grubbin, seeding & fencing

Project Owner

US-ARMY CORPS OF ENGRS OFFUTT AFB

Project Design & Engineering

Engineer: US-ARMY CORPS OF ENGRS OFFUTT AFB