Industrial Laboratory Project Case Study in Minnesota

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of industrial laboratory projects in Minnesota are also available.

Project Overview

Project Title:FIRST DISTRICT DAIRY LAB BP2
Estimated Value:$2,000,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build industrial laboratories in Minnesota depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Minnesota
County:Meeker
City:Litchfield
Address:Swift Ave

Project Type

Building Category:Industrial Laboratories
Work Type:New

Project Description:

Industrial Laboratory Concrete Foundation, Other Structural Frame, Masonry Exterior , Steel Joist Roof Structure, Steel Bar Joist Roof Deck , Single Ply Roof Other Structural Frame = Precast Concrete Mechanical & Civil Bid Package

Project Owner

FIRST DISTRICT COOPERATIVE

Project Design & Engineering

Architect: ENGAN ASSOCIATES, PA
Structural Engineer: LS Engineers
Mechanical Engineer: Martin Mechanical Design, Inc.
Electrical Engineer: WILLMAR ELECTRIC SRVC

Project Construction

Construction Manager: STRACK CONSTR CO INC