The following estimate assumes face brick with concrete block back-up / steel frame in Whitehorse, YT, using 2013 RSMeans data.
Whitehorse, YT Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Construction Total
$123.09
$13,540,000
Contractor Fees (GC,Overhead,Profit)
25%
$30.77
$3,385,000
Architectural Fees
6%
$7.39
$812,400
Total Building Cost
$161.25
$17,737,300