Project Overview
| Project Title: | ASU BIO DESIGN INSTITUTE PHASE 2 |
|---|
| Start Date: | 2004-05-01 |
|---|
| Estimated Value: | $50,500,000 (a more accurate cost estimate is available from RSMeans Online) |
|---|
The cost to build
colleges & universities in Arizona depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on
RSMeansOnline.com.
Project Location
| State: | Arizona |
|---|
| County: | Maricopa |
|---|
| City: | Tempe |
|---|
| Address: | Rural Rd & Tyler St |
|---|
Project Type
Project Description:
College, University - Miscellaneous Clean Room, Closet, Computer, Equipment Bay, Equipment Storage, Exhibit Area, Foyer, Kennel, Laboratory, Lecture Hall, Mechanical Room, Office[s], Records Storage, Restroom, Science Room, Vehicle Parking, Vocational Cast In Place Concrete Foundation, Cast In Place Concrete Structural Frame, Structural Steel Frame, Masonry Exterior , Other Roof Structure, Other Roof Deck, Built Up Roof, Single Ply Roof
Project Owner
ASU-PURCHASING & BUSINESS SERVICES
Project Design & Engineering
Architect: GOULD EVANS ASSOCS
Project Construction
Joint Venture Const Manager: DPR CONST
Mechanical Contractor: DYNAMIC SYSTEMS, INC
Electrical Contractor: KEARNEY ELEC
Drywall: PERFORMANCE CONTRG
Roofing: PROGRESSIVE ROOFING
Masonry: SUN VALLEY MASONRY
Concrete: SUNDT CONST INC-HEAVY CIVIL ENGRG DIV
Joint Venture Const Manager: SUNDT CONSTRUCTION INC