The following estimate assumes concrete block / steel frame, using 2013 RSMeans data.
National Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Construction Total
$94.00
$2,820,000
Contractor Fees (GC,Overhead,Profit)
25%
$23.50
$705,000
Architectural Fees
6%
$5.64
$169,200
Total Building Cost
$123.14
$3,694,200
Building Products Used in Manufacturing Facility Construction
PREVent-C® Admixture and PREMagMOC™ Cement Components by CPG PREVent-C is a unique dual mechanism magnesium based product that significantly reduces shrinkage and shrinkage-related cracks in concrete. The product is extremely user friendly and has a neutral effect on other concrete properties.
PreMagMOC Part A materials when reacted in the appropriate proportions with PREMagMOC– Part B form magnesium oxychloride cement (MOC) when blended with water. MOC cements provide a strong and durable binder system for a wide variety of construction products applications for internal use.
Manufacturing Facility Construction Project Leads
Reed Construction Data can provide you with comprehensive, accurate and timely information on upcoming construction projects. Here is a sample project up for bid.