Military Dormitory Project Case Study in Massachusetts

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of military dormitory projects in Massachusetts are also available.

Project Overview

Project Title:WORCESTER POLYTECH STUDENT DORMITORY
Start Date:2007-06-01
Estimated Value:$19,000,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build colleges & universities in Massachusetts depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Massachusetts
County:Worcester
City:Worcester
Address:Between Boynton & Dean

Project Type

Building Category:Colleges & Universities, Military Dormitories
Work Type:New

Project Description:

Dormitory, College, University - Miscellaneous Activity, Dormitory Space, Gymnasium, Study, Vending, Weight Room Concrete Foundation, Cast In Place Concrete Structural Frame, Brick Exterior, Curtainwall Exterior , Other Exterior Wall, Air Handling System Other Exterior Walls = Limestone Exterior Fan Coil Units

Project Owner

WORCESTER POLYTECHNIC INSTITUTE

Project Design & Engineering

Architect: Cannon Design
Structural Engineer: Cannon Design
Electrical Engineer: Cannon Design
Civil Engineer: CULLINAN ENGINEERING CO

Project Construction

Landscape Designer: Brown/Sardina, Inc.
General Contractor: GILBANE BUILDING CO