Military Housing Project Case Study in Missouri

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of military housing projects in Missouri are also available.

Project Overview

Project Title:WHITEMAN AFB MILITARY FAMILY HOUSING
Estimated Value:$62,500,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build military housing in Missouri depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Missouri
County:Johnson
City:Whiteman AFB
Address:Whiteman Air Force Base (FY 05, 06 & 07)

Project Type

Building Category:Military Housing
Work Type:New

Project Description:

Military Housing Closet, Dwelling Units, Food Storage, Laundry, Restroom, Shower, Vehicle Parkin Design/Build; Construction Of 239 Single & Duplex Military Family Housing Univt With All Necessary & Supporting Amenities & Facilities Demolition Of Approximately 296 Existing Family Housing Units Including Asbesto & Lead Paint Removal Project Site Work Includes Roadway Extension, Roadway Overlay, Electrical Replacement To Underground, Street Lighting, Playgrounds, Shade Structures, Signage, Landscaping, Sidewalks, Walking Paths With Lighting, Traffic Revisions Recreation Areas, sewers, Storm Drainage System, Cable TV, Telephone System, & Waterline Extensions New Housing Units Include 2,3,& 4 Bedroom Units With Air Conditioning, Patio, Decks, Fencing, Porches, Storage & Garages With Door Openers

Project Owner

US ARMY CORPS OF ENGRS KANSAS CITY DIST

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Common Work Results for Utilities
  • Concrete Forming
  • Concrete Forming and Accessories
  • Concrete Reinforcing
  • Electricity Metering
  • Facility Fire Hydrants
  • Manholes and Structures
  • Natural Gas Metering
  • Steam Energy Distribution Metering
  • Structural Concrete
  • Utilities
  • Water Utility Distribution Fire Hydrants
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of Missouri construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$18,186,318,014
    Bid Phase:$226,516,085
    Post-Bid:$58,818,274,713
    Civil Projects (value)
    Pre-Bid Phase:$1,422,502,887
    Bid Phase:$161,811,503
    Post-Bid:$25,027,696,042