Movie Theater Project Case Study in California

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of movie theater projects in California are also available.

Project Overview

Project Title:CENTURY THEATRES AT THE RIVER
Start Date:2003-06-01
Estimated Value:$500,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build movie theaters in California depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:California
County:Riverside
City:Rancho Mirage
Address:17800 Hwy 111

Project Type

Building Category:Movie Theaters
Work Type:Addition

Project Description:

Movies Movie Theater Concrete Slab On Grade Foundation, CMU Block Structural Frame, Structural Steel Frame, Split Face CMU Exterior, Built Up Roof, Package Air Conditioning/Heat Pump System Three Additional Screens Addition, Paint Exterior Walls, EPDM Roofing System, Fire Sprinklers

Project Owner

CENTURY THEATERS INC/CINEARTS

Project Design & Engineering

Mechanical Engineer: Davar & Associates
Plumbing Engineer: Davar & Associates
Architect: Fehlman LaBarre
Structural Engineer: KPFF Consulting Engineers

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Acoustical Ceilings
  • Acoustical Metal Pan Ceilings
  • Acoustical Panel Ceilings
  • Acoustical Tile Ceilings
  • Adobe Finish
  • Air Barriers
  • Air Outlets and Inlets
  • Air to Air Energy Recovery Equipment
  • Architectural Woodwork
  • Architecturally Exposed Structural Steel Framing
  • Bases Ballasts and Paving
  • Carpeting
  • Carved Wood Doors
  • Cementitious Backing Boards
  • Cold Formed Metal Framing
  • Communications Distribution
  • Data Communications
  • Demolition
  • Diffusers Registers and Grilles
  • Distributed Communications and Monitoring Systems
  • EIFS - Exterior Insulation and Finish Systems
  • Exploratory Excavations
  • Fabricated Fireproofed Steel Columns
  • Facility Fire Suppression Water Service Piping
  • Flush Wood Doors
  • Geophysical Investigations
  • Glazed Decorative Metal Railings
  • Glazing
  • Gypsum Board
  • Gypsum Sheathing
  • Hardware
  • Heat Pipe Air to Air Energy Recovery Equipment
  • Heat Wheel Air to Air Energy Recovery Equipment
  • HVAC Gravity Ventilators
  • Interior Lighting
  • Material Testing
  • Membrane Roofing
  • Metal Decking
  • Metal Doors and Frames
  • Metal Fabrications
  • Metal Joists
  • Metal Ladders
  • Metal Railings
  • Metal Stairs
  • Painting and Coating
  • Pipe and Tube Railings
  • Portland Cement Plastering
  • Prefinished Wood Doors
  • Resilient Base and Accessories
  • Resilient Flooring
  • Resilient Sheet Flooring
  • Resilient Tile Flooring
  • Rough Carpentry
  • Seismic Investigations
  • Selective Site Demolition
  • Selective Structure Demolition
  • Sheet Carpeting
  • Stile and Rail Wood Doors
  • Structural Steel Framing
  • Subsurface Drilling and Sampling
  • Subsurface Investigation
  • Thermal Protection
  • Thermal Storage
  • Tile Carpeting
  • Tiling
  • Veneer Plastering
  • Voice Communications
  • Wood Doors
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of California construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$202,631,432,920
    Bid Phase:$5,205,384,871
    Post-Bid:$384,942,067,110
    Civil Projects (value)
    Pre-Bid Phase:$19,895,204,396
    Bid Phase:$1,751,408,695
    Post-Bid:$95,489,603,204