Movie Theater Project Case Study in Indiana

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of movie theater projects in Indiana are also available.

Project Overview

Project Title:AMC THEATRE AT CASTLETON SQUARE BP3
Estimated Value:$4,500,000 - a more accurate cost estimate is available from RSMeans Online
The cost to build movie theaters in Indiana depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Indiana
County:Marion
City:Indianapolis
Address:620 E 82nd St

Project Type

Building Category:Movie Theaters
Work Type:New

Project Description:

Movies Break Room, Closet, Concession, Customer Service, Gaming, Mezzanine, Movie Theater, Office[s], Projection Room, Restroom, Storage Split Face CMU Exterior, Stucco Exterior, Metal Roof Deck 14-Screen Movie Theater At Castleton Square Mall

Project Owner

AMC THEATRES

Project Design & Engineering

Blue Printer: EASTERN ENGINEERING SUPPLY INC
Plumbing Engineer: Henderson Engineers
Electrical Engineer: Henderson Engineers
Mechanical Engineer: Henderson Engineers
Structural Engineer: NORTON & SCHMIDT CONSULTING ENGINEERS

Project Construction

General Contractor: MESSER CONSTRUCTION

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Acoustical Ceilings
  • Acoustical Metal Pan Ceilings
  • Acoustical Panel Ceilings
  • Acoustical Tile Ceilings
  • Air Barriers
  • Air Outlets and Inlets
  • Air to Air Energy Recovery Equipment
  • Architectural Wood Casework
  • Bulk Material Processing Equipment
  • Bumper Guards
  • Carved Wood Doors
  • Cementitious Backing Boards
  • Commissioning of HVAC
  • Communications Distribution
  • Compartments and Cubicles
  • Corner Guards
  • Dampproofing and Waterproofing
  • Data Communications
  • Diffusers Registers and Grilles
  • Dimensional Letter Signage
  • Distributed Communications and Monitoring Systems
  • Electronic Message Signage
  • Elevators
  • Entrances and Storefronts
  • Facility Fire Suppression Water Service Piping
  • Finish Carpentry
  • Flush Wood Doors
  • Glazing
  • Gypsum Board
  • Gypsum Sheathing
  • Hardware
  • Heat Pipe Air to Air Energy Recovery Equipment
  • Heat Wheel Air to Air Energy Recovery Equipment
  • HVAC Gravity Ventilators
  • Illuminated Panel Signage
  • Interior Lighting
  • Low Voltage Electrical Transmission
  • Membrane Roofing
  • Metal Doors and Frames
  • Non Illuminated Panel Signage
  • Painting and Coating
  • Piece Material Handling Equipment
  • Plaster and Gypsum Board
  • Plastic Laminate Clad Architectural Cabinets
  • Prefinished Wood Doors
  • Resilient Base and Accessories
  • Resilient Flooring
  • Resilient Sheet Flooring
  • Resilient Tile Flooring
  • Rough Carpentry
  • Signage
  • Sound Vibration and Seismic Control
  • Stile and Rail Wood Doors
  • Suspension Systems
  • Terrazzo Flooring
  • Testing Adjusting and Balancing for HVAC
  • Thermal Protection
  • Thermal Storage
  • Tiling
  • Toilet Bath and Laundry Accessories
  • Voice Communications
  • Wall and Door Protection
  • Wood Doors
  • Wood Veneer Faced Architectural Cabinets
  • Want more projects like this?


    Get FREE Leads emailed to you each week!

    Total value of Indiana construction projects currently in our database:

    Commercial Projects (value)
    Pre-Bid Phase:$9,529,507,512
    Bid Phase:$963,444,000
    Post-Bid:$103,822,792,394
    Civil Projects (value)
    Pre-Bid Phase:$1,197,751,531
    Bid Phase:$95,289,999
    Post-Bid:$26,163,374,956