Parking Garage Project Case Study in Florida

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of parking garage projects in Florida are also available.

Project Overview

Project Title:MOUND HOUSE GARAGE RENOVATION
Start Date:2005-03-01
Estimated Value:$90,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build parking garages in Florida depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Florida
County:Lee
City:Ft Myers Beach
Address:289 Connecticut St

Project Type

Building Category:Parking Garages
Work Type:Alteration

Project Description:

Parking Garage, Government - Miscellaneous Building Construction Of Interior Partitions, Handicapped Restrooms And Other Miscellaneous Construction

Project Owner

TOWN OF FORT MYERS BEACH

Project Design & Engineering

MasterFormat® Divisions Included in Project Scope

The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

  • Carved Wood Doors
  • Domestic Water Pumps
  • Finish Carpentry
  • Flush Wood Doors
  • Fountain Pumps
  • Low Voltage Electrical Transmission
  • Painting and Coating
  • Plumbing Fixtures
  • Prefinished Wood Doors
  • Roofing and Siding Panels
  • Rough Carpentry
  • Sanitary Sewerage Pumps
  • Stile and Rail Wood Doors
  • Sump Pumps
  • Swimming Pool Pumps
  • Thermal Protection
  • Wood Doors