This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of prison projects in Florida are also available.
| Project Title: | LEE CO ORTIZ CORRECTIONAL FACILITY |
|---|---|
| Start Date: | 2005-06-01 |
| Estimated Value: | $500,000 (a more accurate cost estimate is available from RSMeans Online) |
Prison Project Consists Of A Pre-Engineered Building With 25% Interior Finish, Airconditioned; New Restroom And Shower Facilities; Finishes Are Metal Studs With Drywall; Ceramic Tile VCT With Vinyl Base; The Exterior Doors Are Hollow Metal With Wood Doors; Ceilings Are Suspended Acoustical; Utilities Include Water, Sewer, And Fire Line