This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of road projects in Wisconsin are also available.
| Project Title: | WIDOT08 MIDDLETON ROAD WORK |
|---|---|
| Estimated Value: | $5,448,530 (a more accurate cost estimate is available from RSMeans Online) |
Bridge[s] & Culvert[s], Road[s], Sidewalk[s], Curb[s], Gutter[s], Electrical Work Excavation Common, 82,300 CY; Base Aggregate Dense, 40,305 Ton; Base Aggregate Open Graded, 120 Ton; Concrete Pavement, 2,036 SY; Concrete Masonry Bridges, 68 CY; Prestressed Girders, 759 LF 45-Inch; Bar Steel Reinforcement, 18,750 Lbs; Bar Steel Reinforcement Coated, 54,810 Lbs; Piling CIP Concrete, 2,600 LF 10 3/4-Inch; Pavement Marking Epoxy, 29,542 LF; Construction Staking, 45,738 LF; Construction Staking, 123 Each; Construction Staking, 5 LS; QMP Base Aggregate, 40,305 Ton; QMP HMA Mixture, 13,133 Ton; QMP Concrete Pavement, 1.5 Days; Incentive Strength Concrete Pavement, 500 Dol; QMP Concrete Structures, 685 CY; Incentive Strength Concrete Structures, 8,220 Dol; Culvert Pipe Temporary, 100 LF 12", 140 LF 18"; Culvert Pipe Corrugated Steel, 54 LF 18"; Culvert Pipe Corrugated Polyethylene, 112 LF 12", 36 LF 18"; Storm Sewer Pipe Reinforced Concrete, 2,240 LF 12", 51 LF 21", 926 LF 42", 284 LF 15", 533 LF 24", 1,207 LF 48", 1,070 LF 18", 540 LF 30", 291 LF 54"; Storm Sewer Reinforced Concrete Horizontal Elliptical, 360 LF 34" X 53"; Concrete Curb, 925 LF; Concrete Curb and Gutter, 17,975 LF; Concrete Sidewalk, 45,180 SF; Asphaltic Surface, 2,487 Ton; HMA Pavement Type E-0.3, 286 Ton, Type E-3, 9,962 Ton; Asphalt MS, SS, CSS 1,181 Gals; Asphaltic Material, 788 Ton; Excavation Stone Piles and Stone Fences, 10 CY; Select Crushed Material, 5,250 Tons; Asphaltic Base Widening, 0.30 Tons; Concrete Base HES, 215 SY; Route and Seal, 792 LF; Concrete Driveway 1,176 SY; HMA Pavement Intersection, 2,885 Tons; Pipe Underdrain, 1,790 LF; Concrete Median Nose, 1,660 SF; Trees, 94 Each; Shrubs, 130 Each; Grasses, 2,64 Each; Signs, 218 SF; Conduit, 10,932 LF; Pull Boxes, 57 Each; Junction Boxes, 6 Each; Concrete Bases, 71 Each; Traffic Signal Cable, 4,597 LF; Cable Type UF 2-12 AWG Grounded, 1,502 LF; Electrical Wire, 7,990 LF; Loop Detector Lead In Cable, 3,486 LF; Loop Detector Wire, 8,426 LF; Pedestal Bases, 11 Each; Transformer Bases, 14 Each; Poles, 14 Each; Traffic Signal Standards, 11 Each; Slurry Backfill, 1,540 CY; Chitosan Flocculant Sock, 40 Each; Water Main Connection, 10 Each; Fire Hydrant, 15 Each; Gate Valves, 34 Each; Reducers, 10 Each; Salvaged Lighting Units, 2 Each; Water Main, 12-Inch 4,062 LF, 10-Inch 37 LF, 8-Inch 310 LF, 6-Inch 635 LF; Water Service 1-Inch, 617 LF; Sanitary Sewer 12-Inch 21 LF, 14-Inch 248 LF; Removing Gauging Station and Retaining Wall, 1 Lump Sum; Storm Water Treatment Device Baysaver, 1 Lump Sum; Stamped Colored Concrete, 12,100 SF; Shredded Bark Mulch, 7,700 SF; Slope Paving Crushed Aggregate Special, 882 SY.
The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.