School Auditorium Project Case Study in Oklahoma

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of school auditorium projects in Oklahoma are also available.

Project Overview

Project Title:BARTLESVILLE ISD FIELDHOUSE
Estimated Value:$5,400,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build school auditoriums in Oklahoma depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Oklahoma
County:Washington
City:Bartlesville
Address:1700 Hillcrest

Project Type

Building Category:School Auditoriums
Work Type:New

Project Description:

School Auditorium, Classroom[s], Gym & Athletic Building, Senior High School Athletic Courts, Athletic Training, Locker Room, Office[s], Restroom Concrete Slab On Grade Foundation, CMU Block Structural Frame, Structural Steel Frame, EIFS Exterior Field House

Project Owner

BARTLESVILLE PUBLIC SCHOOLS

Project Design & Engineering

Architect: CRAFTON, TULL, SPARKS & ASSOC
Architectural/Design Consultant: Hollis & Miller Group, Inc.
Structural Engineer: Snowden Engineering Inc.

Project Construction

General Contractor: RICK SCOTT CONSTRUCTION