High School Information
High School Square Foot Cost Estimates
The following estimate assumes face brick with concrete block back-up / steel frame, using 2013 RSMeans data.
| National Cost Estimate (Union Labor) | % of Total | Cost Per SF | Cost |
| Construction Total | | $122.48 | $15,922,500 |
| Contractor Fees (GC,Overhead,Profit) | 25% | $30.62 | $3,980,600 |
| Architectural Fees | 6% | $7.35 | $955,400 |
Total Building Cost | $160.45 | $20,858,500 |
Building Products Used in High School Construction
Duralife Lockers® by Scranton ProductsScranton Products™, the leader of the high density polyethylene (HDPE) plastic and locker industry for over 26 years, has revolutionized the corridor locker. Introducing Duralife Lockers® – the only HDPE plastic locker that is fully fire-rated for your corridor application. Specially designed to meet the demands of the school environment, Duralife® Lockers are built to withstand the harshest daily use. Virtually maintenance free, HDPE outperforms metal lockers at a comparable price point, providing years of everyday low maintenance. |
Completed High School Projects
Featured High School Projects:
Choose from the States and Provinces below to find Local Completed High School ProjectsView High School Construction Information by State/Province