| Project Title: | ADAMS 12 5 STAR HIGH SCHOOL BID PKG MECH |
|---|
| Start Date: | 2004-07-01 |
|---|
| Estimated Value: | $30,000,000 (a more accurate cost estimate is available from RSMeans Online) |
|---|
The cost to build
high schools in Colorado depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on
RSMeansOnline.com.
Project Location
| State: | Colorado |
|---|
| County: | Adams |
|---|
| City: | Westminster |
|---|
| Address: | 128th Ave & Huron St |
|---|
Project Type
Project Description:
Senior High School Administrative, Assembly, Athletic Courts, Athletic Training, Basketball Court, Cafeteria, Classroom[s], Computer, Dining, Dressing/Changing, Food Preparation, Food Storage, Gymnasium, Kitchen, Laboratory, Library, Locker Room, Lounge, Media Center, Office[s], Restroom, Science Room, Shower, Sports Fields, Studio Concrete Foundation, Structural Steel Frame, Brick Exterior, Concrete Block Exterior, Steel Joist Roof Structure, Metal Roof Deck, Built Up Roof, Standing Seam Metal Roof, Air Handling System, Chilled Water Cooling System Landscaping, Irrigation System, Skylights, Aluminum Windows/Aluminum Storefront Windows & Entry Door System, Ceramic Tile, 4 Elevators, Fire Sprinklers, Fire Alarms, Rooftop HVAC Units
Project Owner
ADAMS TWELVE FIVE STAR SCHOOLS
Project Design & Engineering
Structural Engineer: MARTIN & MARTIN CONSULTING ENGINEERS
Civil Engineer: SA MIRO INC
Project Construction
Construction Manager: ADOLFSON & PETERSON INC
General Contractor: ADOLFSON & PETERSON INC