High School Information

High School Square Foot Cost Estimates

The following estimate assumes face brick with concrete block back-up / steel frame in Royal Oak, MI, using 2013 RSMeans data.
Royal Oak, MI Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Construction Total $121.13 $15,747,400
Contractor Fees (GC,Overhead,Profit) 25% $30.28 $3,936,800
Architectural Fees 6% $7.27 $944,800
Total Building Cost $158.68 $20,629,000
Cost Estimates for Other Cities in Michigan

Building Products Used in High School Construction

Duralife Lockers® by Scranton Products
Scranton Products™, the leader of the high density polyethylene (HDPE) plastic and locker industry for over 26 years, has revolutionized the corridor locker. Introducing Duralife Lockers® – the only HDPE plastic locker that is fully fire-rated for your corridor application. Specially designed to meet the demands of the school environment, Duralife® Lockers are built to withstand the harshest daily use. Virtually maintenance free, HDPE outperforms metal lockers at a comparable price point, providing years of everyday low maintenance.
Documents Avaliable:
  Technical Datasheets vailable for download Technical Datasheets

Completed High School Projects in Michigan

Featured Michigan High School Projects:

Trying to find Information on Completed High School Projects in Michigan?

Browse through our library of 70 new high school construction projects that have been built in Michigan over the past 5 years.

Companies that Specialize in High Schools in Michigan

ArchitectsView More Architects >>General Contractors

View High School Construction Information by State/Province

View All Building Categories>>
 Get More Upcoming Projects

IT'S FREE - GET STARTED!
Do you work on High Schools in Michigan?