The following estimate assumes face brick with concrete block back-up / steel frame in Whitehorse, YT, using 2013 RSMeans data.
Whitehorse, YT Cost Estimate (Union Labor)
% of Total
Cost Per SF
Cost
Construction Total
$119.05
$15,476,700
Contractor Fees (GC,Overhead,Profit)
25%
$29.76
$3,869,200
Architectural Fees
6%
$7.14
$928,600
Total Building Cost
$155.96
$20,274,400
Building Products Used in High School Construction
Duralife Lockers® by Scranton Products Scranton Products™, the leader of the high density polyethylene (HDPE) plastic and locker industry for over 26 years, has revolutionized the corridor locker. Introducing Duralife Lockers® – the only HDPE plastic locker that is fully fire-rated for your corridor application. Specially designed to meet the demands of the school environment, Duralife® Lockers are built to withstand the harshest daily use. Virtually maintenance free, HDPE outperforms metal lockers at a comparable price point, providing years of everyday low maintenance.