This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of sidewalk, curb & gutter projects in Oregon are also available.

Project Overview

Project Title:CHEMAWA STATION PHASE 1
Estimated Value:$813,224 (a more accurate cost estimate is available from RSMeans Online)
The cost to build water and sewage piping in Oregon depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Oregon
County:Marion
City:Keizer
Address:Chemawa Rd & Interstate 5

Project Type

Building Category:Water and Sewage Piping, Sidewalks, Curbs & Gutters, Roads
Work Type:New

Project Description:

Road[s], Sidewalk[s], Curb[s], Gutter[s], Water Piping, Electrical Work, Excavating & Grading, Flood Control, Sitework, Sewage Piping Grubbing, Clearing, Excavation, Complete Erosion Control Measures, Paved Bike Path & Retaining Walls Street Improvements: 1,150 Lineal Feet New Street Construction, Crub & Gutter, 12,250 Square Feet Concrete Sidewalk Strom Drain: 1,325 Lineal Feet Of New Storm Pipe, Trenching, Backfill, Manholes Catch Basins, Water Quality Manholes Sanitary Sewer: 605 Lineal Feet Of New Sanitary Pipe, Trenching, Backfill, Fittings & Valves Landscape: Street Trees & Irrigation Electrical: Vaults & Street Light

Project Owner

GRAND RONDE TRIBAL HOUSING AUTHORITY

Project Design & Engineering

Landscape Architect: Bradley Engineering
Civil Engineer: WESTLAKE CONSULTANTS

Project Construction

General Contractor: KERR CONST