This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of sidewalk, curb & gutter projects in South Carolina are also available.

Project Overview

Project Title:SCDOT S-08-0546 SIDEWALKS CONSTRUCTION
Start Date:2004-10-01
Estimated Value:$245,195 (a more accurate cost estimate is available from RSMeans Online)
The cost to build sidewalks, curbs & gutters in South Carolina depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:South Carolina
County:Berkeley
Address:Rd S-08-0546

Project Type

Building Category:Sidewalks, Curbs & Gutters
Work Type:New

Project Description:

Sidewalk[s], Curb[s], Gutter[s] 1.000 LS MOBILIZATION 1.000 LS CONSTRUCTION STAKES,LINES&GRADES 1.000 LS TRAFFI CONTROL 233.000 SY REMOVAL&DISPOSAL OF EXISTING PAVEMENT 164.000 CY UNCLASSIFIE EXCAVATION 453.000 CY BORROW EXCAVATION 200.000 TON MAINTENANCE STONE 3.000 TON LIQUID ASPHALT BINDER PG64-22 40.000 TON H/M ASPHALT CONCRETE SURFACE COURSE-TYPE 1 196.000 SF PERMANENT CONSTRUCTION SIGNS 3.000 CY CONCRETE FOR STRUCTURES-CLASS 3000(ROADWAY)221.000 LB REINFORCING STEEL FOR STRUCTURES-(ROADWAY)208.000 LF 15" RC PIPE CULVERT-CLASS III 1330.000 LF 18" RC PIPE CULVERT-CLASS III 14.000 EA 18"X 15" RC CULVERT TEE-CLASS III 1.000 EA CATCH BASIN-TYPE 16 1.000 EA CATCH BASIN-TYPE 18 27.000 EA DROP INLET(24"X 36")1.000 EA MANHOLE 1.000 EA DROP INLET(24"X 36")-CONVERT CATCH BASIN TYPE-9 800.000 SY CONCRETE SIDEWALK-(4" UNIFORM)183.000 SY CONCRETE DRIVEWAY-(6" UNIFORM)13.000 CY AGGREGATE UNDERDRAIN 100.000 LF 6" PERFORATED PIPE UNDERDRAIN 1.175 MSY PERMANENT VEGETATION 0.294 MSY TEMPORARY VEGETATION 1.469 MSY MOWING 200.000 LF SEDIMENT TUBE-20" 1348.000 LF SILT FENCE

Project Owner

SC DEPT OF TRANSPORTATION