Special School Project Case Study in Washington

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of special school projects in Washington are also available.

Project Overview

Project Title:WASHINGTON YOUTH ACADEMY
Estimated Value:$3,233,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build special schools in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Washington
County:Kitsap
Address:Washington Army National Guard Readiness

Project Type

Building Category:Special Schools
Work Type:New

Project Description:

Special School, Dormitory, Vocational Training Activity, Administrative, Classroom[s], Computer, Dormitory Space, Equipment Storage, Food Preparation, Food Storage, Office[s], Restroom, Shower, Storage, Vehicle Parking, Vocational Concrete Slab On Grade Foundation, Wood Structural Frame, Other Exterior Wall, Wood Joist Roof Structure, Asphalt Shingle Roof, Other Mechanical System 17,000 Square Feet Administration & Dorm Building; Installation Of 3 Modular Classroom Buildings Other Exterior Walls=Fiber Cement Siding Other Mechanical System=Gas Filled Furnaces & Air Cooled Conditioning Units

Project Design & Engineering