The following estimate assumes face brick with concrete block back-up / steel frame, using 2013 RSMeans data.
National Cost Estimate (Union Labor) % of Total Cost Per SF Cost
Construction Total $128.93 $5,157,000
Contractor Fees (GC,Overhead,Profit) 25% $32.23 $1,289,300
Architectural Fees 6% $7.74 $309,400
Total Building Cost $168.89 $6,755,700

Building Products Used in Vocational Training Center Construction

POWERVATOR® Emergency Return Systems by Reynolds & Reynolds Electronics
Architects and consultants specify R&R’s POWERVATOR® to assure that power will be applied to an elevator during a power outage and that passengers may safely exit the elevator car. Battery Backup improves passenger safety by addressing the anxiety associated with entrapment, which may lead to passengers prying doors open, people jumping between floors, etc.
Documents Avaliable:
  Technical Datasheets vailable for download Technical Datasheets

Vocational Training Center Construction Project Leads

Reed Construction Data can provide you with comprehensive, accurate and timely information on upcoming construction projects. Here is a sample project up for bid.
More About This Project >>
Fox Valley Chilton Regional Center 2014

Value: $300,000Location: Calumet, WI
Phase: BIDLast Updated: 2014-03-29

Completed Vocational Training Center Projects

Featured Vocational Training Center Projects:


Choose from the States and Provinces below to find Local Completed Vocational Training Center Projects

View Vocational Training Center Construction Information by State/Province

View All Building Categories>>
Want more projects like this?


Get FREE Leads emailed to you each week!
Do you work on Vocational Training Centers?