Water and Sewage Piping Project Case Study in Vermont

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of water and sewage piping projects in Vermont are also available.

Project Overview

Project Title:VTDOT I 91 CURED-IN-PLACE PIPE LINER
Estimated Value:$337,336 - a more accurate cost estimate is available from RSMeans Online
The cost to build water and sewage piping in Vermont depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Vermont
County:Windham
Address:Interstate 91/Various

Project Type

Building Category:Water and Sewage Piping
Work Type:New

Project Description:

Flood Control, Sewage Piping ROCKINGHAM IM SCRP (5): WORK TO BE PERFORMED AT AN ISOLATED LOCATION, MILE MARKER 0.351 ON THE INTERSTATE 91 NORTHBOUND EXIT 6 OFF RAMP (RAMP "A") IN THE TOWN OF ROCKINGHAM; INSTALLATION OF A CURED-IN-PLACE PIPE LINER, INSTALLATION OF A CONCRETE HEADWALL, WINGWALLS, CHANNEL AND EMBANKMENT STABILIZATION; 201.10 CLEARING AND GRUBBING,INCLUDING INDIVIDUAL TREES AND STUMPS 1.000 LS 203.27 UNCLASSIFIED CHANNEL EXCAVATION 32.000 CY 203.30 EARTH BORROW 50.000 CY 204.25 STRUCTURE EXCAVATION 104.000 CY 204.30 GRANULAR BACKFILL FOR STRUCTURES 72.000 CY 501.34 CONCRETE,HIGH PERFORMANCE CLASS B 29.000 CY 507.15 REINFORCING STEEL 3,130.000 LB 514.10 WATER REPELLENT,SILANE 15.000 GAL 529.25 REMOVAL OF CONCRETE OR MASONRY 4.000 CY 605.20 6 INCH UNDERDRAIN CARRIER PIPE 30.000 LF 613.12 STONE FILL,TYPE III 32.000 CY 613.13 STONE FILL,TYPE IV 20.000 CY 621.75 REMOVE AND RESET GUARDRAIL 37.500 LF 621.90 TEMPORARY TRAFFIC BARRIER 60.000 LF 621.95 REMOVE AND RESET TEMPORARY TRAFFIC BARRIER 60.000 LF 630.10 UNIFORMED TRAFFIC OFFICERS 40.000 HR 635.11 MOBILIZATION/DEMOBILIZATION 1.000 LS 641.10 TRAFFIC CONTROL 1.000 LS 649.31 GEOTEXTILE UNDER STONE FILL 48.000 SY 649.51 GEOTEXTILE FOR SILT FENCE 28.000 SY 651.15 SEED 1.000 LB 651.18 FERTILIZER 5.000 LB 651.20 AGRICULTURAL LIMESTONE 0.500 TON 651.25 HAY MULCH 0.500 TON 651.35 TOPSOIL 3.000 CY 652.10 EPSC PLAN 1.000 LS 652.20 MONITORING EPSC PLAN 8.000 HR 652.30 MAINTENANCE OF EPSC PLAN(N.A.B.I.)1.000 LU 653.55 PROJECT DEMARCATION FENCE 532.000 LF 900.608 SPECIAL PROVISION(CONTROLLED DENSITY(FLOWABLE)FILL)25.000 CY 900.640 SPECIAL PROVISION(CURED-IN-PLACE PIPE LINER)(66")142.000 LF 900.640 SPECIAL PROVISION(TEST BORINGS)180.000 LF 900.645 SPECIAL PROVISION(TEMPORARY ACCESS ROAD AND STAGING AREAS,CULVERT)1.000 LS 900.645 SPECIAL PROVISION(TEMPORARY RELOCATION OF STREAM)1.000 LS