Water and Sewage Piping Project Case Study in Washington

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of water and sewage piping projects in Washington are also available.

Project Overview

Project Title:2005 SEWER MAIN IMPROVMENTS
Estimated Value:$404,565 (a more accurate cost estimate is available from RSMeans Online)
The cost to build water and sewage piping in Washington depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Washington
County:Snohomish
City:Bothell

Project Type

Building Category:Water and Sewage Piping
Work Type:Alteration

Project Description:

Water Piping, Sewage Piping 2005 Sewer Main Improvements. Construction Of Schedule A And Schedule B Compris The Base Bid. Schedule A Beardslee Boulevard (At NE 185th Street) And Schedule 100th Avenue NE (between NE 202nd Street And NE 204th Street) Is To Install Approximately 416 Linear Feet Of 10 PVC Sewer Mains, 380 Linear Feet Of 8 PVC Sewer Mains, 131 Linear Feet Of 6 PVC Sewer Laterals, Five 48 Diameter Man-Hole With Guliner Base, Connection To Existing Manholes, Asphalt Patching, Along Wit Appurtenances, And Restoration.

Project Owner

BOTHELL-DEPT OF PUBLIC WORKS

Project Design & Engineering

Engineer: Pace Engineers