Municipal Water and Wastewater Facility Project Case Study in Iowa

This project information is pulled from our database of hundreds of thousands of construction projects that have been started over the past 5 years. Use it to research ideas and potential partners for your own project. Additional examples of municipal water and wastewater facility projects in Iowa are also available.

Project Overview

Project Title:CENTRAL COOLING PLANT BP 3
Estimated Value:$750,000 (a more accurate cost estimate is available from RSMeans Online)
The cost to build municipal water and wastewater facilities in Iowa depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to this one, an accurate estimate of the costs to build your particular project is available on RSMeansOnline.com.

Project Location

State:Iowa
County:Dallas
City:Woodward

Project Type

Building Category:Municipal Water and Wastewater Facilities, Water and Sewage Piping
Work Type:Alteration

Project Description:

Water Treatment, Water Piping, Sewage Piping Installation Of Underground Chill Water Supply & Return Piping From The Existin Central Cooling Plant To Four Separate Facilities At Woodward Resource Center, Installation Of More Than 4000 LF Each Of Chill Water Supply & Chill Water Return Piping That Shall Be Routed Underground & Through Some Tunnel Sections T The Appropriate Mechanical Rooms Of Hemlock, Larches, Westwood & Grantwood School, New Chill Water Supply Lines Shall Be Interconnected To The Existing Centralized Colling Plant & The Various Existing Chilled Water Piping Systems Within The Above Described Buildings

Project Design & Engineering