Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News
home news index tips for estimating concrete work

Tips for Estimating Concrete Work

December 16, 2008 - RSMeans Engineering Staff

Featured in:

Join the Discussion!

Concrete is one of the most adaptable and versatile materials used in the construction industry. It can be custom-mixed to the desired compressive strength or for color application, it can be placed in almost any shape or form using a variety of methods, and it can be finished to resemble a variety of surfaces such as wood, masonry or stone. Concrete is durable and virtually maintenance-free. It is also fairly easy to work with and installs relatively quickly. For these and many other reasons, concrete is one of the most widely used materials in construction projects.

To be accurate, the estimator should carefully check all the plans and specifications for the project. Concrete often appears on drawings other than structural drawings, such as the need for equipment pads in the mechanical and electrical drawings, or curbs and sidewalks in the civil drawings.

When estimating structural concrete, pay particular attention to requirements for concrete additives, curing methods and surface treatments. Special consideration for climate conditions as well as hot or cold weather conditions must be included in your estimate. Also include requirements for concrete placing and finishing methods and equipment.

For accurate concrete estimating, the estimator must consider each of the following major components individually: formwork, reinforcing steel, ready-mix concrete, placement of the concrete mix, finishing of the surface, and curing.

Formwork is normally taken off in square feet (generally in square feet of area in contact with the concrete, as opposed to the actual area of forms used).

Reinforcing is normally taken off in tons of rebar, hundreds of square feet (CSF) of welded wire fabric, or pounds of pre-stressing strands.

Ready-mix concrete is normally taken off in cubic feet, but then converted to cubic yards, as this is the unit of measure that suppliers charge for.

Placing of ready-mix concrete is normally taken off in cubic yards for each of the placing methods (direct chute, conveyor, pump truck, and crane & bucket).

Finishing the concrete surface is normally taken off in square feet and can include the top surface of flatwork as well as vertical walls and horizontal structure faces that will be exposed.

Curing is normally taken off in hundreds of square feet (CSF) for each of the curing methods (water curing, chemical compound membrane, and sheet membrane).

Each of these major components will be explored further in future articles.

Post Your Own Comments 
» Not a member? Register now to become one. Otherwise, login to post your comments on this article.

Related News & Information

Related Channels

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

You can take a demo and receive a free trial version of SmartBIM Library Manager 3.0 - includes 2862 families representing 22950 product types.

Learn how!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.