Through our relationship with the American Institute of Architects (AIA), Reed Construction Data tracks down the construction project leads that you need to grow your business in today's competitive marketplace. This is a sample project from our database of active commercial construction projects available through our subscription project lead services for the state of West Virginia. For more project leads like these, just complete the information request form below to get information about subscription project lead services available from Reed Construction Data.
| Last Updated: | 2013-5-24 |
|---|---|
| Stage: | Biddate Set |
| Status: | BIDS: 06/27/2013, 01:30 PM |
| Estimated Value: | $24,000,000 (a more accurate cost estimate is available from RSMeans Online) |
| Conditions: | Mandatory Pre-Bid Conference 05/30/2013 1:30 PM |
| Plans & Specs: | Should be available on SmartProject News |
| State: | West Virginia |
|---|---|
| County: | Morgan County |
| City: | Berkeley Springs |
| Address: | 818 Cacapon Lodge Dr |
| Building Category: | Municipal Water and Wastewater Facilities, Community Centers, Park Buildings |
|---|---|
| Work Type: | Addition/Alteration |
Park Building,Water Piping,Sewage Piping,Golf Course[s] Construct An Expansion & Improvements To The Lodge, Improvements To The Golf Course, & Improvements To The Water Supply & Waste Water Treatment Systems At Cacapon State Park
[Division 2]: Clearing, Dewatering, Earthwork, Grading, Excavation, Slope Protection & Erosion Control, Piles & Caissons, Paving & Surfacing, Sewerage & Drainage, Fences & Gates, Landscaping. [Division 3]: Concrete Formwork, Concrete Reinforcement, Structural Concrete. [Division 4]: Concrete Unit Masonry, Stone. [Division 5]: Structural Steel, Metal Joists, Metal Decking, Cold Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Railings, Expansion Joints. [Division 6]: Rough Carpentry, Wood Timber, Finish Carpentry. [Division 7]: Waterproofing, Insulation, Firestopping, Shingles, Manufactured Roofing & Siding, Membrane Roofing. [Division 8]: Metal Doors, Wood Doors, Coiling Doors and Grilles, Folding Doors & Grilles, Entrances & Storefronts, Plastic Windows, Hardware, Glass & Glazing. [Division 9]: Ceiling Suspension Systems, Drywall/Gypsum, Tile, Acoustical Ceilings, Wood Flooring, Resilient Flooring, Carpet, Painting, Wall Coverings. [Division 10]: Compartments & Cubicles, Louvers & Vents, Fireplaces & Stoves, Exterior Signs, Interior Signs, Lockers, Fire Extinguishers, Partitions. [Division 11]: Audio-Visual Equipment, Loading Dock Equipment, Food Service Equipment. [Division 12]: Manufactured Casework, Rugs & Mats. [Division 13]: Swimming Pools. [Division 14]: Elevators. [Division 15]: Mechanical Insulation, Fire Protection Systems, Plumbing Piping, Plumbing Fixtures, Hydronic Piping, Packaged A/C Units, Air Handling, Ductwork, Controls & Instrumentation, Testing & Balancing. [Division 16]: Service/Distribution, Interior Lighting, Exterior Lighting, Standby Power Generator Systems, Alarm & Detection Systems, Voice & Data Systems, Electrical Controls.
The names of the project owner, architects, engineers and contractors are available to community members only. If you are already a member, Log in now. Or we invite you to join our online community now to view this information -- it's free!
Detailed bid information is available to community members only. If you are already a member, Log in now. Or we invite you to join our online community now to view this information -- it's free!
The following product types are included in the plans for this project. Click on any link to get product information from our SmartBuilding Index directory of commercial building products -- including product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.
View all West Virginia sample project leads
Total value of West Virginia construction projects currently in our database:
| Commercial Projects (value) | |
| Pre-Bid Phase: | $2,828,969,184 |
| Bid Phase: | $164,848,000 |
| Post-Bid: | $10,827,514,939 |
| Civil Projects (value) | |
| Pre-Bid Phase: | $513,945,501 |
| Bid Phase: | $18,950,000 |
| Post-Bid: | $8,031,641,425 |