ERIE CO POLICE/PUBLIC SAFETY BLDG-BP 5
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Governmental Offices |
| Work Type: | New |
| Bid Date: | 2004-03-04 |
| Work Began: | 2004-05-01 |
Governmental Office[s], Police Station Laboratory, Office[s] Structural Steel Frame, Curtainwall Exterior , Metal Panel Exterior, Steel Joist Roof Structure, Metal Roof Deck, Built Up Roof, Other Mechanical System Emergency Operations Center, Maintenance Area, Offices For New York State Wireless, Communications Center, Fire/Police & Medical Dispatch Center, Fire Arms Laboratory, DNA Laboratory, Forensics Laboratory Other Mechanical System = Rooftop VAV HVAC System Landscaping, Irrigation System, Overhead Doors, Aluminum Storefront Windows/Entry Door System, Ceramic Tile, 2 Service & 2 Passenger Elevators, Fir Sprinklers, Fire Alarms
Project Participants edit/contribute
RSMeans Project Cost Estimate
| Original Estimated Project Cost: | $33000000 |
The cost to build governmental offices in Buffalo, New York depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to Erie Co Police/public Safety Bldg-bp 5, an accurate estimate of the costs to build your particular project is available on MeansCostWorks.com.
Or, RSMeans quick cost estimates are available for the following project configurations:
- Town Hall (1 Story) with Brick Veneer / Wood Frame
- Town Hall (1 Story) with Brick Veneer / Wood Frame
- Town Hall (1 Story) with E.I.F.S. / Wood Frame
- Town Hall (1 Story) with E.I.F.S. / Wood Frame
- Town Hall (1 Story) with Face Brick with Concrete Block Back-up / Steel Joists
- Town Hall (1 Story) with Face Brick with Concrete Block Back-up / Steel Joists
- Town Hall (1 Story) with Face Brick with Concrete Block Back-up / Wood Joists
- Town Hall (1 Story) with Face Brick with Concrete Block Back-up / Wood Joists
- Town Hall (1 Story) with Stone with Concrete Block Back-up / Steel Joists
- Town Hall (1 Story) with Stone with Concrete Block Back-up / Steel Joists
- Town Hall (1 Story) with Stone with Concrete Block Back-up / Wood Joists
- Town Hall (1 Story) with Stone with Concrete Block Back-up / Wood Joists
Project Location
| Address: | N & S Division Sts & Elm St & Michigan Buffalo, NY |
| County: | Erie |
More New York construction projects are available via our New York construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

