UT ARLINGTON PHYSICS & CHEMISTRY BLDG
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Colleges & Universities |
| Work Type: | New |
| Bid Date: | 2003-12-17 |
| Work Began: | 2004-01-01 |
Classroom[s] Auditorium, Laboratory, Office[s] Drilled Piers, Cast In Place Concrete Structural Frame, Brick Exterior, Metal Panel Exterior, Other Exterior Wall, Steel Joist Roof Structure, Metal Roof Deck, Single Ply Roof, Other Mechanical System 4th Level Mechanical Penthouse, Partial Basement Area 200 Seat Planetarium, 3 Story Atrium Lobby, Conference Room Other Exterior Walls = Limestone Exterior Other Roof Structure = Concrete Other Mechanical System = 4 Penthouse Mounted HVAC Units ADDITIONAL DESCRIPTION: Landscaping, Irrigation System, Skylights, Overhead Doors, Curtain-Wall Windows, Ceramic Tile/Porcelin Tile/Terazzo Tile, 2 Elevators, Fire Sprinklers, Fire Alarms
Project Participants edit/contribute
Project Location
| Address: | Corner Of College St & Southwest St Arlington, TX |
| County: | Tarrant |
More Texas construction projects are available via our Texas construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

