ST VRAIN VALLEY SCHOOL DST HIGH SCHOOL 7
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | High Schools |
| Work Type: | New |
| Bid Date: | 2007-03-08 |
| Work Began: | 2007-04-01 |
Activity, Administrative, Assembly, Auditorium, Band Room, Cafeteria, Classroom[s], Closet, Cold Storage, Communications, Computer, Concession, Equipment Storage, Food Preparation, Food Storage, Gymnasium, Kitchen, Library, Lounge, Maintenance, Mechanical Room, Meeting Room, Office[s], Reading, Records Storage, Restroom, Science Room, Security, Storage, Study, Vehicle Parking, Vending Structural Steel Frame, Steel Bar Joist Roof Deck , Built Up Roof 750-Student High School Campus With One & Two-Story Wings Concrete Paving, Sidewalks, Asphalt Paving, Athletic Fields, Running Track, Sit Utilities, Landscaping, Irrigation
Project Participants edit/contribute
Project Location
| Address: | 12750 County Road 7 Mead, CO 80504-9518 |
| County: | Boulder |
More Colorado construction projects are available via our Colorado construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

