TRUCKEE MEADOWS WATER REC EXPANSION PROJ
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment |
| Work Type: | Addition/Alteration |
| Bid Date: | 2004-03-23 |
Primary Influent Structure, Primary Sedimentation Tank No 2D, Primary Sludge/Scum Pump Room, Primary Screening Facility, Exisitng Aeration Tank Modifications, New Aeration Tank No 2C, New Secondary Sedimentation Tank No 2D, RAS Pump Room, Existing Blower Building Modifications, Nitrification Pump Station & Pipe Gallery, New Chemical Building No 2, Existing Chlorination Building, New Ferric Chloric Building, Acid-Phase Digeste No 1, New Digester Control Building No, Existing Primary Sludge Replacement, Gravity Thickener, Anaerobic Digester, Odor Control System, Site Demolition & Improvements, Electrical & Instrumentation Systems
Project Participants edit/contribute
Project Location
| Address: | 8500 Clean Water Way Reno, NV 89502 |
| County: | Washoe |
More Nevada construction projects are available via our Nevada construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

