EL DORADO HILLS WTP EXPANSION
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water and Sewage Piping, Electrical Work |
| Work Type: | Alteration |
| Bid Date: | 2004-02-19 |
Folsom Lake Raw Water Pump Station: Install District Supplied Raw Water Submersible Pumps, Booster Pump, Moters, Switch Gear, Associated Valves, Piping, Electrical & Communication Equipment EDHWTP: Replace Filter Media, Repair Filter Underdrain & Underdrain Access Manhole Of A 560 Ft (Sq) Gravity Filter, Install District Supplied Vertical Turbine Booster Pumps, Moters, Switch Gear, Associated Valves, Piping, Electrical & Communicati Equipment, Extend & Modify Existing Precast Concrete Cribwall, Provide & Instal Conversion Kits To Provide Manual Operation Of Existing Valves On Two Filters, Provide Water Quality Monitoring Equipment To Be Installed By Others, Provide Commercial Potable Water Diving Services To Clean & Inspect The EDHWTP Chlorine Contact Basin
Project Participants edit/contribute
Project Location
| Address: | Various Locations CA |
| County: | El Dorado |
More California construction projects are available via our California construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

