BOWLER TRANSMISSION MAIN
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water and Sewage Piping |
| Work Type: | Alteration |
Water Piping Approximately 9,000 lineal feet of 6-inch diameter potable water transmission main, including hydrants, valves, fittings, and associated work. The water main will be constructed between existing Well Station No. 1 and the proposed Well Station No. 3 within the right-of-way of Kolpack Road
Project Participants edit/contribute
Project Location
| Address: | Bowler, WI |
| County: | Shawano |
More Wisconsin construction projects are available via our Wisconsin construction news and information page. Information on local building codes is available as well
RSMeans Project Cost Estimate
| Original Estimated Project Cost: | $125200 |
The cost to build water and sewage piping in Bowler, Wisconsin depends upon the location, project scope, specific components used and current market conditions.
If you are looking to size the cost of building a project similar to Bowler Transmission Main, an accurate estimate of the costs to build your particular project is available on MeansCostWorks.com.

