CAESARS AUGUSTUS HOTEL - LOWRISE PODIUM
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Chapels, Hotels |
| Work Type: | Addition |
| Work Began: | 2003-11-01 |
| Work Completed: | 2005-11-01 |
Hotels Guest Room[s] Curtainwall Exterior , EIFS Exterior , Standing Seam Metal Roof, Membrane Roofing Mat Footing Foundation, Post-Tension Concrete Structural Frame 190,000 SF Lowrise Podium With 3 Stories (1 Below Grade), For Guestroom Tower Addition To Existing Hotel; Podium To Include Mezzanine, Catwalk, Casino, Wedding Chapel, Promenade, Retail Space, VIP Lounge, 2 Restaurants; Project Als Includes Renovation Of Existing Registration Lobby With Interior Fountains Fire Partition Doors & Expansion Joints
Project Participants edit/contribute
Project Location
| Address: | Las Vegas Blvd & Flamingo Rd Las Vegas, NV |
| County: | Clark |
More Nevada construction projects are available via our Nevada construction news and information page. Information on local building codes is available as well
RSMeans Project Cost Estimate
| Original Estimated Project Cost: | $190000000 |
The cost to build chapels in Las Vegas, Nevada depends upon the location, project scope, specific components used and current market conditions.
If you are looking to size the cost of building a project similar to Caesars Augustus Hotel - Lowrise Podium, an accurate estimate of the costs to build your particular project is available on MeansCostWorks.com. Or, RSMeans Quick Cost Estimates are available for the following project configurations:
- Hotel (4-7 Story) with Face Brick with Concrete Block Back-up / R/Conc. Frame
- Hotel (4-7 Story) with Face Brick with Concrete Block Back-up / R/Conc. Frame
- Hotel (4-7 Story) with Face Brick with Concrete Block Back-up / Steel Frame
- Hotel (4-7 Story) with Face Brick with Concrete Block Back-up / Steel Frame
- Hotel (4-7 Story) with Glass and Metal Curtain Walls / R/Conc. Frame
- Hotel (4-7 Story) with Glass and Metal Curtain Walls / R/Conc. Frame
- Hotel (4-7 Story) with Glass and Metal Curtain Walls / Steel Frame
- Hotel (4-7 Story) with Glass and Metal Curtain Walls / Steel Frame
- Hotel (4-7 Story) with Precast Concrete Panels / R/Conc. Frame
- Hotel (4-7 Story) with Precast Concrete Panels / R/Conc. Frame
- Hotel (4-7 Story) with Precast Concrete Panels / Steel Frame
- Hotel (4-7 Story) with Precast Concrete Panels / Steel Frame
- Hotel (8-24 Story) with Face Brick Veneer On Steel Studs / R/Conc. Frame
- Hotel (8-24 Story) with Face Brick Veneer On Steel Studs / R/Conc. Frame
- Hotel (8-24 Story) with Face Brick Veneer On Steel Studs / Steel Frame
- Hotel (8-24 Story) with Face Brick Veneer On Steel Studs / Steel Frame
- Hotel (8-24 Story) with Face Brick with Concrete Block Back-up / R/Conc. Frame
- Hotel (8-24 Story) with Face Brick with Concrete Block Back-up / R/Conc. Frame
- Hotel (8-24 Story) with Face Brick with Concrete Block Back-up / Steel Frame
- Hotel (8-24 Story) with Face Brick with Concrete Block Back-up / Steel Frame
- Hotel (8-24 Story) with Glass and Metal Curtain Walls / R/Conc. Frame
- Hotel (8-24 Story) with Glass and Metal Curtain Walls / R/Conc. Frame
- Hotel (8-24 Story) with Glass and Metal Curtain Walls / Steel Frame
- Hotel (8-24 Story) with Glass and Metal Curtain Walls / Steel Frame
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

