ARAPAHOE WATER MAIN & WELL
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Piping |
| Work Type: | Alteration |
| Bid Date: | 2004-04-29 |
Water Piping Contract A Water Main: 12" water transmission main; other water main' pressure regulating station; chemical feed manhole and miscellaneious piping, hydrants, fittings and tie-ins, street removal and replacement, fencing, seeding, disnifection, testing Contract B New Well: 3 new municipal water wells (including new well house); ne casing and stainless steel screen; deep well turbine pump; electric motor; column pipe and pump base; two auxiliary power units; construction a pre lube well; installing new discarge piping including electric check valve and meter
Project Participants edit/contribute
Project Location
| Address: | Arapahoe, NE |
| County: | Furnas |
More Nebraska construction projects are available via our Nebraska construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

