Who We Are US Division Canada Division Product Information Management Partners Careers Advertising Opportunities Press Releases Reed In The News
Construction Project Leads BIM SmartBuilding Index Construction Costs (RSMeans) Market / Predictive Analytics Building Product Information Daily Commercial News Journal of Commerce B2B Marketing Construction Market Research
SmartBIM Market Insights Connections RSMeans SmartBuzz accessArchitecture Green Construction US Construction Canadian Construction
Search Project Leads Building Product Information Regional News & Info Building Codes Building Cost Models Project Library by Building Type eNewsletters Blogs Ask Our Experts Events
Upload Plans & Specs
RSMeans Bookstore Preorder 2010 Cost Data SmartProject News
home regions illinois chicago project library ildot rte 94/90 ramp reconstruction

ILDOT RTE 94/90 RAMP RECONSTRUCTION

Construction Project Case Study

This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.

Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!

Project Type:Excavating & Grading, Fencing
Work Type:Alteration
Bid Date:2004-07-30
Work Began:2004-08-01

Road[s], Excavating & Grading, Fencing 1.68 miles of ramp reconstruction(northbound)from 31st Street to 39th Street an temporary shoulders from 31st Street to 47th Street all located along I-94/90(Dan Ryan Expressway)in Chicago;includes 14,978 cu yds earth excavation;4,843 cu yds removal and disposal of unsuitable material;242 cu yds trench backfill;19,939 sq yds topsoil;4.25 acres seeding;8,616 sq yds subbase granular material;2,518 sq yds stabilized subbase;3,364 sq yds concrete base course;2,518 sq yds concrete pavement(jointed);5,782 sq yds milling;8,227 sq yd pavement removal;214 sq yds bituminous shoulders,SUPERPAVE;removal of 2 existin structures;292 cu yds concrete removal;933 cu yds structure excavation;504 cu yds concrete;6,037 sq ft rustification finish;20,460 lbs reinforcement bars;62,850 lbs epoxy coated reinforcement bars;6,735 sq ft temporary sheet piling;425 ft steel plate beam guardrail;6 traffic barrier terminals;170 cu yds nonspecial waste disposal;125 sq ft sign panel;37.5 ft overhead sign structure-cantilever;34,251 ft epoxy pavement marking;1,512 ft conduit in trench;4,431 ft trench and backfill;353 ft drilled shafts in soil;4,696 ft concrete curb and gutter;2,518 sq yds whitewashing for concrete pavement;1,184 tons bituminous concrete binder and surface course,SUPERPAVE,MIX D;5,907 sq ft concrete median surface;mobilization;traffic control and protection.

Project Owner
IL STATE DEPT OF TRANSPORTATION
Help build this project case study!
If you were part of the project team, provided or installed products, know the history of the building or problems encountered during its construction, please share it with the community!
Names of companies involved in the project should not go in the project description, but submitted here so we can link to your company profile. Images or videos you would like to share should be emailed to the webmaster.

Project Location

Address:31st St To 39th St To 47th St/Various
Chicago, IL
County:Cook

More Illinois construction projects are available via our Illinois construction news and information page. Information on local building codes is available as well

   Community Login | Register

Search Site

Advanced Search


What's Hot

Take a Demo!


Recent News

E Newsletter

Do You Know?

How BIM could impact your business? The BIM Handbook can help.

Learn how!


Resource Center

© 2009 Reed Construction Data Inc. All rights reserved.