ILDOT RTE 94/90 RAMP RECONSTRUCTION
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Excavating & Grading, Fencing |
| Work Type: | Alteration |
| Bid Date: | 2004-07-30 |
| Work Began: | 2004-08-01 |
Road[s], Excavating & Grading, Fencing 1.68 miles of ramp reconstruction(northbound)from 31st Street to 39th Street an temporary shoulders from 31st Street to 47th Street all located along I-94/90(Dan Ryan Expressway)in Chicago;includes 14,978 cu yds earth excavation;4,843 cu yds removal and disposal of unsuitable material;242 cu yds trench backfill;19,939 sq yds topsoil;4.25 acres seeding;8,616 sq yds subbase granular material;2,518 sq yds stabilized subbase;3,364 sq yds concrete base course;2,518 sq yds concrete pavement(jointed);5,782 sq yds milling;8,227 sq yd pavement removal;214 sq yds bituminous shoulders,SUPERPAVE;removal of 2 existin structures;292 cu yds concrete removal;933 cu yds structure excavation;504 cu yds concrete;6,037 sq ft rustification finish;20,460 lbs reinforcement bars;62,850 lbs epoxy coated reinforcement bars;6,735 sq ft temporary sheet piling;425 ft steel plate beam guardrail;6 traffic barrier terminals;170 cu yds nonspecial waste disposal;125 sq ft sign panel;37.5 ft overhead sign structure-cantilever;34,251 ft epoxy pavement marking;1,512 ft conduit in trench;4,431 ft trench and backfill;353 ft drilled shafts in soil;4,696 ft concrete curb and gutter;2,518 sq yds whitewashing for concrete pavement;1,184 tons bituminous concrete binder and surface course,SUPERPAVE,MIX D;5,907 sq ft concrete median surface;mobilization;traffic control and protection.
Project Participants edit/contribute
Project Location
| Address: | 31st St To 39th St To 47th St/Various Chicago, IL |
| County: | Cook |
More Illinois construction projects are available via our Illinois construction news and information page. Information on local building codes is available as well