ROMERIA POINT CONDOMINIUM COMPLEX
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Condominiums, Parking Garages |
| Work Type: | New |
| Bid Date: | 2007-11-08 |
Condominium[s] Parking Garage Concrete Slab On Grade Foundation, Structural Steel Frame, Wood Structural Frame, Other Exterior Wall, Stucco Exterior, Concrete Tile Roof Package Air Conditioning/Heat Pump System Other Exterior Walls-Stone Veneer
Project Participants edit/contribute
Project Location
| Address: | Romeria Pt Carlsbad, CA 92009 |
| County: | San Diego |
More California construction projects are available via our California construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

