LRECD WASTEWATER TREATMENT PLANT EXPANSI
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment, Sewage Treatment |
| Work Type: | Addition/Alteration |
| Bid Date: | 2004-08-31 |
| Work Began: | 2004-10-01 |
Water Treatment, Sewage Treatment Construction Of Modifications To The Existing Headworks Facility, Installation Of A Mechanical Bar Screen, Equalization Tanks And Return Pump Station, Aeratio Tanks, Blower Building, Secondary Clarifier, RAS Pump Station , WAS Pump Units, Sludge Holding Tank Odor Control Systems, Sludge Transfer Pumps, Belts Press, Backwash Recovery Basin, Chlorine Contact Basin And New Pump Station, Reuse Filters, Chlorine Building , Electrical Building, Filter Pump Station And Septage Receiving Station, Modifications To Existing Structures, And Miscellaneous Site Improvements
Project Participants edit/contribute
Project Location
| Address: | 2500 Jupiter Park Drive Jupiter, FL |
| County: | Palm Beach |
More Florida construction projects are available via our Florida construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

