MISSION RIDGE LIFT STATION
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment, Sewage Treatment |
| Work Type: | Alteration |
| Bid Date: | 2005-01-07 |
Water Treatment, Sewage Piping Lift Station, Force Main & Sewer Replacement%3B 12" DIP Force Main, Replacement Of Pumping Equipment, Controls & Appurtenances On An Existing Wet Well, Replacement Of 8" VCP Sewer With 14" HDPE Or 12" PVC Sewer Pipe
This was located at 1226 E. Sleepy Hollow Drive. The city made changes to the plan and several issues have arrived regarding the generator and the unit is now flooding homes. The generator is a misuse of application and the city has been notified of this design flaw.
Project Participants edit/contribute
Project Location
| Address: | Olathe, KS |
| County: | Johnson |
More Kansas construction projects are available via our Kansas construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

