DENVER PUBLC SCHLS PARENT PROJ #3127
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Elementary Schools, Junior High Schools |
| Work Type: | Alteration |
| Bid Date: | 2005-02-24 |
Elementary School, Junior High School, Senior High School Carpet, Flooring, &/Or Exterior Painting At 6 Schools: John F. Kennedy High School, 2855 S Lamar St South High School, 1700 E Louisianna Ave Martin Luther King Jr., 19535 E 46th Ave Rishel Middle School, 451 S Tejon St Maxwell Elementary School, 14390 E Bolling Dr Steck Elementary School, 425 Ash St
Project Participants edit/contribute
RSMeans Project Cost Estimate
| Original Estimated Project Cost: | $450000 |
The cost to build elementary schools in Denver, Colorado depends upon the location, project scope, specific components used and current market conditions. If you are looking to size the cost of building a project similar to Denver Publc Schls Parent Proj #3127, an accurate estimate of the costs to build your particular project is available on MeansCostWorks.com.
Or, RSMeans quick cost estimates are available for the following project configurations:
- Elementary School with Decorative Concrete Block / Bearing Walls
- Elementary School with Decorative Concrete Block / Bearing Walls
- Elementary School with Decorative Concrete Block / Steel Frame
- Elementary School with Decorative Concrete Block / Steel Frame
- Elementary School with Face Brick with Concrete Block Back-up / Bearing Walls
- Elementary School with Face Brick with Concrete Block Back-up / Bearing Walls
- Elementary School with Face Brick with Concrete Block Back-up / Steel Frame
- Elementary School with Face Brick with Concrete Block Back-up / Steel Frame
- Elementary School with Stucco on Concrete Block / Bearing Walls
- Elementary School with Stucco on Concrete Block / Bearing Walls
- Elementary School with Stucco on Concrete Block / Steel Frame
- Elementary School with Stucco on Concrete Block / Steel Frame
- Jr High School with Concrete Block Stucco Face / Bearing Walls
- Jr High School with Concrete Block Stucco Face / Bearing Walls
- Jr High School with Concrete Block Stucco Face / Steel Frame
- Jr High School with Concrete Block Stucco Face / Steel Frame
- Jr High School with Decorative Concrete Block / Bearing Walls
- Jr High School with Decorative Concrete Block / Bearing Walls
- Jr High School with Decorative Concrete Block / Steel Frame
- Jr High School with Decorative Concrete Block / Steel Frame
- Jr High School with Face Brick with Concrete Block Back-up / Bearing Walls
- Jr High School with Face Brick with Concrete Block Back-up / Bearing Walls
- Jr High School with Face Brick with Concrete Block Back-up / Steel Frame
- Jr High School with Face Brick with Concrete Block Back-up / Steel Frame
Project Location
| Address: | 6 Schools In District Denver, CO |
| County: | Denver |
More Colorado construction projects are available via our Colorado construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

