SILVER PLUME MICROFILTRATION WTP
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Water Treatment |
| Work Type: | New |
| Bid Date: | 2005-10-20 |
Water Treatment New 170 Gallon Per Minute Microfilitration Water Treatment Plant Including 20' 32" Masonry building With Built-Up Twin Tee Roof System Including Site Work, Poured-In-Place Concrete, Presedimentation Pond, Level Control Manhole, Site Yard Piping, Mechanical, Electrical, Standby Generator, Process Piping, Chemica Feed Systems, Pumping Systems, SCADA System & Appurtenances For Complete & Operational System Will Be Received
Project Participants edit/contribute
Project Location
| Address: | Silver Plume, CO |
| County: | Clear Creek |
More Colorado construction projects are available via our Colorado construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

