SCHOOL FOR BLIND PHYSICAL ED CENTER
This project information is pulled from our database of hundreds of thousands of historical construction projects. Help us build a complete case study of this project by adding information you know -- like issues encountered during construction, how your products were used.
Are you looking for current project leads (in planning stage or up for bid) to help grow your business? Then we can help!
Project Overview edit/contribute
| Project Type: | Special Schools |
| Work Type: | New |
| Bid Date: | 2007-12-11 |
Gym & Athletic Building Activity, Administrative, Assembly, Athletic Courts, Athletic Training, Basketball Court, Classroom[s], Dressing/Changing, Gymnasium, Locker Room, Multi Purpose Room, Office[s], Restroom, Shower, Swimming Pool Concrete Foundation, Concrete Tilt-Up Structural Frame, Structural Steel Frame, Brick Exterior, Metal Panel Exterior, Membrane Roofing, Other Mechanical System New Full Physical Education Center & Gym Including Classrooms & Swimming Pool Other Mechanical System = Roof Top Boiler System
Project Participants edit/contribute
Project Location
| Address: | 2214 E 13th St Vancouver, WA 98660 |
| County: | Clark |
More Washington construction projects are available via our Washington construction news and information page. Information on local building codes is available as well
CSI Categories Included in Project Scope
The following product types were used in this project. Click on any link to get more information on that product type from SmartBuilding Index -- including usage tips & techniques, product sourcing, manufacturer catalogs, formatted specs, CAD details and BIM objects.

